← All solutions

Solutions / Telecom & internet service providers

Extend the reach.
Plan every connection.

Placement and compute for the next part of your network. Bring equipment, power and connectivity requirements together before a new point of presence takes shape.

Discuss your next PoP

From requirement to deployment

01

Put the equipment in context.

A network deployment begins with more than rack units. Share the equipment list, interface types, normal and peak draw, delivery arrangements and any redundancy requirements.

02

Define the connections that make it useful.

Identify required carriers, cross-connects and interface speeds. Discuss availability and demarcation for the chosen facility; any specific network capability must be confirmed in the order.

03

Plan the work on the ground.

Installation, cabling, authorised access and remote tasks need an agreed procedure. Document the acceptance checks, escalation path and responsibilities for future changes.

The first conversation

Bring the brief.
We’ll work through it.

Carrier access, cross-connects, BGP and other network options require express confirmation. Availability is specific to the location and order.

Discuss your next PoP
  1. The location

    Target market, facility preferences and expected deployment window.

  2. The equipment

    Dimensions, power, interfaces and redundancy requirements.

  3. The operation

    Required connections, access model and on-site tasks.